Marble blocks prepared at the Sylacauga quarry
From Selection to Supply

Project services.

The work between selecting a stone and standing in front of the finished installation. Available with Alabama White supply, global sourcing engagements, and owner-direct purchases.

Service Framework

Seven points of coordination around the material decision

Each engagement defines the included services, approval authority, contracting parties and project responsibilities in writing.

Alabama Marble Company supplies stone and coordinates defined project interfaces. Architecture, engineering, conservation, fabrication and installation remain with the qualified parties identified by the project.
01

Specification support

Basis-of-design language, available source documentation and project-specific submittal inputs for the design professional to review. The project architect remains responsible for the final specification and assembly.

02

Material & source identification

We identify candidate materials and documented source paths against the project's design intent, application, budget context, quantity, availability and schedule, then disclose the commercial and processing path. Review Global Stone Sourcing →

03

Range & selection management

Range boards, dry-lay photo review and approval workflows help the project team define and maintain the accepted visual range. Final acceptance authority remains as assigned in the contract documents.

04

Source inspection & selection

When included in the written scope and permitted by the source or processor, we coordinate block selection at the quarry, production checks at the processor and packaging review before freight—adjustments at the source, not at the end of the project. These observations are not engineering, fabrication acceptance or a warranty.

05

Processing & fabrication coordination

Qualified independent processors are selected and coordinated for the project scope, schedule and technical requirements. Shop & cut ticket support connects drawings, tickets and stone before cutting; the processor or fabricator retains responsibility for dimensions, means, methods, engineering, tolerances, workmanship and warranties.

06

Packing & freight

Crating standards, carrier coordination and delivery sequencing are aligned to the construction schedule. The written quotation identifies who contracts for freight and who carries responsibility for loading, transit, unloading, storage, damage and schedule risk.

07

Supply planning & scheduling

Lead-time planning is tied to the construction calendar, with compression options when milestones slip upstream. No option or delivery date is committed until cost, capacity and approval effects are confirmed in writing.

Engagement Basis

The service scope follows the supply path

Alabama White begins with direct Sylacauga supply. A globally sourced stone requires a confirmed commercial channel. An owner-direct purchase requires written coordination with the architect, contractor, processor and installer.

Material
Named source and current range
Approvals
Assigned decision authority
Processing
Qualified independent party
Freight
Written contracting responsibility
Schedule
Current assumptions and milestones
Records
Project-specific documentation